Published News » Business

To lay down the procedure for operation of JASCO–P–1030 POLARIMETER. This procedure is applicable for Quality Control Department (Block-D). Switch on the main instrument, which is placed left corner of the rear side. switch on the computer. Double click on JASCO – P – 1030 Icon on the desktop. A Spectra Manager window will appear on the screen. Double click on standard menu. A initialization dial
To lay down the procedure for operation of Bandelin Sonorex - Sonicator. This procedure is applicable in Quality Control department. Check whether the side knob is closed. This knob is opened for draining the water from the instrument and kept closed while filling the water in the instrument and when the instrument is in use. Open the top lid and check the level of water. The optimum level is at
To lay down the procedure for operation of Merck Digital Burette. This procedure is applicable for Quality Control department. Fix the Burette to the Bottle containing required titrant as per STP. Switch on the Burette by pressing the upper on/off part of the on/off – Clear button. The display is 00.00. If some other reading is displayed, then press the lower clear part of the on/off – clear but
We provide secure & reliable home working / remoter worker solutions for your business. Stay connected with smart cloud PBX solutions from allin1number. Vital Telcoms provides affordable solutions that are right for you. It enables remote working for a modern, flexible organisation.
ArmstrongProducts.co.in is the ultimate online shopping place in India, where you can find distinctive ranges of branded work boots or shoes.
We commit excellent quality shoes at the most affordable prices.
To lay down the procedure for operation of THERMOLAB – Hot water bath. This procedure is applicable in Quality Control department. Remove the lid of the water bath provided at the top. Fill water in the bath to a level such that the vessel base is sitting properly over the bottom base of the water bath. Switch on the mains switch of the instrument. Switch on the Stirrer switch also. This ensures
To lay down the procedure for operation of THERMOLAB – Muffle Furnace. This procedure is applicable for Quality Control department. Open the square door of the Muffle furnace. Take the sample to be dried in a suitable container and keep it inside the furnace and close the door. For setting the required temperature, in the temperature indicator, press the PV/SV (process/set) key.
To lay down the procedure for operation of THERMOLAB – Oven. This procedure is applicable in Quality Control department. Switch on the Mains switch. For setting the required temperature, in the temperature indicator, press the upward key to increase the temperature and press the downward key to decrease the temperature. The temperature changes are highlighted in green color reading that is meant

Username:

Password:

Remember:

Copyright © 2018 ReferBookmarks  |